Please use this identifier to cite or link to this item: https://hdl.handle.net/10316/97131
Title: The Use of Modern Design Tools in BIM Technology. Conceptual Design of Community Centre in Rzeszow
Authors: Brodowska, Katarzyna
Orientador: Martins, João Pedro Simões Cândido
Keywords: Tecnologia BIM; Centro Comunitario em Rzeszow; REVIT; estruturas metalicas; BIM technology; Community Centre in Rzeszow; Revit; steel structures
Issue Date: Jun-2016
Place of publication or event: Coimbra
Abstract: Em primeiro lugar, foi utilizado o modelo de edifício projetado pelo arquiteto. O Modelo continha muitos erros e não possuia sistema de suporte de carga, colunas e vigas. Para o propósito deste projeto, o modelo foi redesenhado no software Revit. Uma vez que o projeto foi aprovado para transferência para o software do robô, descobriu-se que não é possível passar diretamente do Revit - Robot. O modelo foi salvo em um arquivo .smxx e em seguida, no Robot carregado como arquivo .smxx. Elementos foram alterados, paredes e tetos de cortina foram convertidos para os revestimentos. Os elementos de aço foram agrupados e foram atribuídos aos tipos relevantes de elementos desenhados. O próximo passo foi definir as combinações de carga e de carga, porque descobriu-se que as seções IPE são muito pequenas,por isso o conceito foi alterado. O teto composto foi escolhido a partir de um catálogo, e as vigas mistas foram contadas manualmente. As características calculadas das vigas foram designados para as vigas no programa robot e os cálculos foram repetidos. Outros elementos foram calculados no programa. Conexões foram criadas e o modelo foi enviado para o Revit. A última parte foi a criação de desenhos e listas de itens.
First, the model of building designed by the architect was used. Model contained many errors, and did not contain load bearing system; columns and beams. For the purpose of this project, model was redesigned in the Revit software. Once the project has been approved for transfer to the Robot software, it turned out that it is not possible to directly link towards Revit - Robot. The model was saved to a .smxx file, then in Robot loaded with .smxx file. Elements were changed, curtain walls and ceilings were converted into the claddings. The steel elements were grouped and they have been assigned to the relevant types of designed elements. The next step was to define the load and load combinations. Because it turned out that the IPE sections are too small, the concept was changed. The composite ceiling was chosen from a catalog, and the composite beams were counted manually. Calculated characteristics of beams were assigned to the beams in the Robot and calculations were repeated. Other elements have been calculated in the program. Connections were created and model was sent to Revit. The last part was creating drawings and schedules of items.
Description: Dissertação de Mestrado em Engenharia Civil apresentada à Faculdade de Ciências e Tecnologia da Universidade de Coimbra.
URI: https://hdl.handle.net/10316/97131
Rights: openAccess
Appears in Collections:UC - Dissertações de Mestrado
FCTUC Eng.Civil - Teses de Mestrado

Show full item record

Page view(s)

78
checked on Aug 14, 2024

Download(s)

93
checked on Aug 14, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.