Please use this identifier to cite or link to this item: https://hdl.handle.net/10316/39063
DC FieldValueLanguage
dc.contributor.advisorLoureiro, Altino de Jesus Roque-
dc.contributor.advisorGonçalves, Alcântara-
dc.contributor.authorSantos, Diogo Miguel Rodrigues dos-
dc.date.accessioned2017-03-28T15:12:06Z-
dc.date.available2017-03-28T15:12:06Z-
dc.date.issued2015-07-10-
dc.identifier.urihttps://hdl.handle.net/10316/39063-
dc.descriptionDissertação de Mestrado em Engenharia e Gestão Industrial apresentada à Faculdade de Ciências e Tecnologia da Universidade de Coimbra.pt
dc.description.abstractO objetivo da realização desta dissertação resulta do interesse da TEandM, Tecnologia e Engenharia de Materiais, S.A, em analisar e melhorar as suas operações na linha de produção de revestimento por projeção térmica (Thermal Spraying). A análise realizada teve como foco principal as atividades executadas pelos operadores ao longo do processo produtivo na aplicação de revestimento. Através desta análise, foram identificadas várias oportunidades de melhoria na linha de produção de revestimento, sendo duas delas particularmente importantes. A primeira surge da desorganização e desarrumação dos materiais de apoio à projeção o que levou à implementação da metodologia Lean, mais propriamente a ferramenta 5S. A segunda oportunidade de melhoria assenta no problema de planeamento de produção encontrado, mais propriamente o sequenciamento da produção. No seguimento desta análise, foram apresentadas propostas de solução para este problema. Para além destes estudos, foram realizados outros trabalhos complementares como a mudança do sistema de armazenamento de matéria-prima e algumas alterações de layout. Todas as sugestões de melhoria foram aceites pela empresa e a correta implementação das mesmas deverá promover maior produtividade, eficiência e simplicidade dos seus processos produtivos.pt
dc.description.abstractThe purpose of this paper is a consequence of the interest of TEandM, Tecnology and Materials Engineering SA, to analyze and improve his operations in Thermal Spraying production line. The analysis focused primarily on the activities carried out by operators throughout the production process in the coating application. Through this analysis, we identified several opportunities to improve coating production lines, two of which are particularly important. The first one arises from the clutter and disorder of materials to support the thermal projection which led to the implementation of Lean methodology, more specifically the 5S tool. The second opportunity for improvement based on production planning problem led to more properly scheduling of production line. Besides these two opportunities for improvement, additional works were performed such as changing the storage system of raw materials and some layout modifications. All improvement suggestions were accepted by the company and is expected that the correct implementation of these changes promotes increased productivity, efficiency and simplicity of production line.pt
dc.language.isoporpt
dc.rightsopenAccesspt
dc.subjectLeanpt
dc.subject5Spt
dc.subjectPlaneamentopt
dc.subjectProduçãopt
dc.subjectSequenciamentopt
dc.subjectprojeção térmica.pt
dc.subjectLeanpt
dc.subject5Spt
dc.subjectPlanningpt
dc.subjectProductionpt
dc.subjectSchedulingpt
dc.subjectThermal Sprayingpt
dc.titleAnálise e organização de operações numa linha de produção de revestimento por projecção térmicapt
dc.title.alternativeAnalysis and organization of operations in a thermal spray coating production linept
dc.typemasterThesispt
degois.publication.locationCoimbrapt
dc.date.embargo2015-07-10*
dc.identifier.tid201665891pt
thesis.degree.grantor00500::Universidade de Coimbrapt
thesis.degree.nameMestrado em Engenharia e Gestão Industrial-
uc.degree.grantorUnit0501 - Faculdade de Ciências e Tecnologiapor
uc.rechabilitacaoestrangeiranopt
uc.date.periodoEmbargo0pt
uc.controloAutoridadeSim-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairetypemasterThesis-
item.cerifentitytypePublications-
item.grantfulltextopen-
item.fulltextCom Texto completo-
item.languageiso639-1pt-
crisitem.advisor.researchunitCEMMPRE - Centre for Mechanical Engineering, Materials and Processes-
crisitem.advisor.orcid0000-0001-9315-3177-
Appears in Collections:UC - Dissertações de Mestrado
FCTUC Eng.Mecânica - Teses de Mestrado
Show simple item record

Page view(s) 50

357
checked on Apr 23, 2024

Download(s) 50

287
checked on Apr 23, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.