Please use this identifier to cite or link to this item: https://hdl.handle.net/10316/38553
DC FieldValueLanguage
dc.contributor.advisorPereira, Fernando José Telmo Dias-
dc.contributor.authorCosta, Ana Margarida Dias Fernandes Lopes da-
dc.date.accessioned2017-03-27T10:03:14Z-
dc.date.available2017-03-27T10:03:14Z-
dc.date.issued2014-02-18-
dc.identifier.urihttps://hdl.handle.net/10316/38553-
dc.descriptionDissertação de Mestrado Integrado em Engenharia Civil apresentada à Faculdade de Ciências e Tecnologia da Universidade de Coimbra.pt
dc.description.abstractA legislação aplicável ao Código dos Contratos Públicos (CCP) inclui a possibilidade da reposição do equilíbrio financeiro de empreitadas públicas para que o empreiteiro/ entidade executante disponha de algumas ferramentas para a salvaguarda dos seus direitos e garantias de prejuízos que não foram previstos no início da obra. O dono de obra público vê-se assim obrigado a compensar os sobrecustos a que o empreiteiro esteve sujeito desde que ocorram circunstâncias e factos estranhos ao empreiteiro que introduzam perturbações e dificuldades de execução, que alterem os pressupostos contratuais iniciais, designadamente: o preço, o prazo de execução, as quantidades, erros e omissões. No entanto, esta reposição só se verifica se o co-contraente, em tempo útil (nos 30 dias subsequentes à ocorrência dos factos) formalizar por escrito uma reclamação com informação das condicionantes surgidas e não previstas nas condições do contrato. Na realidade o co-contraente tem que saber fazer uma gestão eficaz de todo o processo, criando evidências do mesmo e ter sempre presente quais são as suas responsabilidades e da entidade adjudicante. Neste sentido, com este trabalho pretende-se numa fase inicial fazer o enquadramento legislativo que sustenta a reposição do equilíbrio financeiro de empreitadas públicas e depois, indicar de uma forma clara quais as ferramentas a utilizar pelo adjudicatário para colocar justiça no contrato, para conseguir uma recompensa dos prejuízos de que foi alvo devido a motivos que lhe são alheios.pt
dc.description.abstractThe legislation applicable to the Public Contract Code (PCC) includes the possibility of restoring the financial balance of public works for which the contractor / performer entity disposes of some tools to ensure their rights and guarantees of losses that were not foreseen in the contract. The owner of public works finds itself obliged to compensate additional costs that the contractor has been subjected since unrelated facts and circumstances that introduces disturbances and difficulties in execution, which alter the initial contractual assumptions, such as price, execution period, quantities, errors and omissions. However, this replacement only occurs if the contractor, timely (within 30 days after the occurrence of the facts) formalizes a written complaint with the information of arising conditions and not foreseen in the terms of the contract. In fact, the contractor has to know how to make effective management of the entire process, creating evidence of it and always keep in mind what are their responsibilities and the contracting entity. Therefore, this work is intended to do on an early stage, the legislative framework that supports the restoration of the financial rebalancing of public contracts and then indicate in a clear way that the tools used by the contractor to put justice in the contract, to get a reward losses which it suffered due to reasons outside its control.pt
dc.language.isoporpt
dc.rightsopenAccesspt
dc.subjectreposição do equilíbrio finaneiropt
dc.subjectCCPpt
dc.subjectreclamaçãopt
dc.subjectrestore the financial balancept
dc.subjectPCCpt
dc.subjectcomplaintpt
dc.titleReequilibrio financeiro de empreitadaspt
dc.typemasterThesispt
degois.publication.locationCoimbrapt
dc.date.embargo2014-02-18*
dc.identifier.tid201658690pt
thesis.degree.grantor00500::Universidade de Coimbrapt
thesis.degree.nameMestrado Integrado em Engenharia Civilpt
uc.degree.grantorUnit0501 - Faculdade de Ciências e Tecnologiapor
uc.rechabilitacaoestrangeiranopt
uc.date.periodoEmbargo0pt
item.cerifentitytypePublications-
item.languageiso639-1pt-
item.fulltextCom Texto completo-
item.grantfulltextopen-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.openairetypemasterThesis-
Appears in Collections:UC - Dissertações de Mestrado
FCTUC Eng.Civil - Teses de Mestrado
Files in This Item:
File Description SizeFormat
Reequilibrio financeiro de empreitadas.pdf3.66 MBAdobe PDFView/Open
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.