Please use this identifier to cite or link to this item: https://hdl.handle.net/10316/20041
DC FieldValueLanguage
dc.contributor.advisorGaspar, Adélio Manuel Rodrigues-
dc.contributor.advisorLamas, Francisco Bispo-
dc.contributor.authorLopes, Sérgio Miguel Bispo-
dc.date.accessioned2012-05-22T16:20:54Z-
dc.date.available2012-05-22T16:20:54Z-
dc.date.issued2011-09-
dc.identifier.citationLopes, Sérgio Miguel - Estudo e aplicação do processo de comissionamento a sistemas de ventilação de edifícios. Disponível em URL: http://hdl.handle.net/10316/20041. Coimbra : [s.n.], 2011. Dissertação de mestradopor
dc.identifier.urihttps://hdl.handle.net/10316/20041-
dc.descriptionDissertação de mestrado em Engenharia Mecânica, apresentada à Faculdade de Ciências e Tecnologia da Universidade de Coimbrapor
dc.description.abstractA presente dissertação tem como principal objetivo esclarecer o conceito de Comissionamento e, como se deve aplicar aos sistemas AVAC, particularmente ao sistema de condutas de distribuição de ar. Com base na pesquisa bibliográfica sobre o tema foi descrito a importância da adoção da prática do Processo de Comissionamento aos sistemas de AVAC e as vantagens da sua aplicação. Visto que atualmente as maiores falhas de instalação e manutenção se verificam nas condutas de distribuição de ar, dá-se prioridade e enfoque às normas e guias para a instalação, isolamento, limpeza e testes de estanquidade em condutas. Neste campo, comparou-se os valores admissíveis, relativamente aos ensaios de estanquidade presentes nas normas SMACNA (utilizadas pela ASHRAE), nas normas EUROVENT (presentes na União Europeia) e o RSECE (regulamento em vigor em Portugal). Aquando do estudo das três metodologias, denota-se sobretudo uma diferença entre os valores admissíveis dos caudais de fuga inerentes a cada metodologia, sendo que ao contrário das normas SMACNA e EUROVENT, o RSECE não tem qualquer tipo de classes de estanquidade e toma apenas um valor máximo de caudal de fuga. Como aplicação prática, procedeu-se a visitas a algumas obras na fase dos ensaios de estanquidade, tendo os resultados, as características dos sistemas instalados e as condições de higiene sido discutidos com base no preconizado na documentação técnica usada como referência. Nas instalações visitadas, destacou-se uma, visto não ser minimamente satisfatória relativamente à limpeza e à estanquidade das condutas. Na totalidade das instalações, os ensaios de estanquidade foram efetuados depois de aplicado o isolamento. O tamponamento de condutas durante a instalação, caso tenha existido, foi efetuado sempre de forma precária, devido à não utilização do material correto para esse fim.por
dc.description.abstractThis dissertation has the main objective of clarifying the concept of commissioning, and how to apply to HVAC systems, particularly the system of air distribution ducts. Based on the literature described the importance of adopting the practice of the commissioning process for HVAC systems and the advantages of their application. Since currently the largest installation and maintenance failures are encountered in air distribution ducts, gives emphasis and focus on standards and guides for installation, insulation, cleaning and testing leakage in ducts. It is also made a comparison of allowable values for the leakage tests present in SMACNA standards (used by ASHRAE), EUROVENT standards (present in the European Union) and RSECE (regulation in force in Portugal). For the flow rates of leakage, there is a difference between the permissible values of the three methodologies, and unlike the SMACNA and EUROVENT standards the RSECE not have any kind of tightness classes and takes only a maximum flow rate of leakage. As a practical application, it was visited some works during the leakage tests and the results, the characteristics and hygiene conditions of systems installed have been discussed on the basis recommended in the technical documentation used as a reference. In installations visited, one stands out, since it is not minimally satisfactory on cleaning and sealing of the ducts. In all plants, the leakage tests were conducted after the application of insulation. The tamponade of ducts during installation, if it existed, was always performed poorly due to not using the correct material for this purpose. Keywords Commissioning, Leakage tests, Climatization, Maintenance of HVAC systems.por
dc.language.isoporpor
dc.rightsopenAccesspor
dc.subjectClimatização de edifíciospor
dc.subjectEnsaios de estanquidadepor
dc.subjectManutenção de sistemas de AVACpor
dc.titleEstudo e Aplicação do Processo de Comissionamento a sistemas de ventilação de edifíciospor
dc.typemasterThesispor
degois.publication.locationCoimbra,2011por
degois.publication.titleEstudo e aplicação do Processo de Comissionamento a sistemas de ventilação de edifíciospor
dc.peerreviewedNopor
item.grantfulltextopen-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextCom Texto completo-
item.openairetypemasterThesis-
item.cerifentitytypePublications-
item.languageiso639-1pt-
crisitem.advisor.researchunitADAI - Association for the Development of Industrial Aerodynamics-
crisitem.advisor.orcid0000-0001-6947-4579-
Appears in Collections:UC - Dissertações de Mestrado
FCTUC Eng.Mecânica - Teses de Mestrado
Show simple item record

Page view(s) 20

1,010
checked on Oct 29, 2024

Download(s) 50

1,078
checked on Oct 29, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.