Please use this identifier to cite or link to this item: https://hdl.handle.net/10316/107890
DC FieldValueLanguage
dc.contributor.advisorFerreira, Luís Miguel Domingues Fernandes-
dc.contributor.authorMendes, Guilherme Santos-
dc.date.accessioned2023-08-02T22:02:37Z-
dc.date.available2023-08-02T22:02:37Z-
dc.date.issued2023-07-21-
dc.date.submitted2023-08-02-
dc.identifier.urihttps://hdl.handle.net/10316/107890-
dc.descriptionDissertação de Mestrado em Engenharia e Gestão Industrial apresentada à Faculdade de Ciências e Tecnologia-
dc.description.abstractA otimização de recursos e eliminação de desperdícios são ações cada vez mais valorizadas pelas organizações. A Boellinghaus Steel, assim como muitas empresas, procura desenvolver as suas ferramentas de melhoria contínua, de forma a alcançar melhores resultados. Da procura pela eficiência dos processos, surge a necessidade de redução dos tempos de mudança de ferramenta de uma nova linha de laminagem.Estabeleceram-se dois objetivos principais: o desenvolvimento de um processo de setup padronizado e a redução de 15% do seu tempo, em cinco meses. De forma a abordar o projeto, numa etapa inicial procurou-se conhecer a empresa, o processo produtivo em estudo e a caracterização detalhada do problema. Numa segunda etapa, é aplicada a metodologia DMADV (Definir, Medir, Analisar, Desenhar e Verificar), sendo utilizada a ferramenta SMED (Single Minute Exchange of Die) na fase analisar. O primeiro objetivo foi cumprido, sendo desenvolvido um processo padronizado, eficiente e seguro para troca de ferramenta da nova linha, culminando na implementação de 8 instruções de trabalho.De seguida, analisaram-se diversas propostas de melhoria, com uma lógica gradual de investimento financeiro. É de realçar que para a primeira proposta, com a utilização eficiente dos recursos da empresa, é esperado um decréscimo de 26% do tempo das tarefas internas, sendo demonstrada uma solução para atingir o segundo objetivo. Com investimento financeiro, na aplicação de modificações nas travessas e no desenvolvimento do Dummy Stand, é estimado atingir uma redução de 73% do tempo interno. Foram aceites 5 das 7 propostas de melhoria, sendo completada a sua implementação quando terminar a fase de testes do equipamento.por
dc.description.abstractThe optimization of resources and waste elimination are increasingly valued actions by organizations. Boellinghaus Steel, like many companies, seeks to develop its continuous improvement tools to achieve better results. This pursuit of process efficiency has led to the need for reducing tool changeover times in a new rolling line.Two main objectives were established: the development of a standardized setup process and a 15% reduction in its time within five months. To address the project, the initial stage involves an effort to understand the company, the production process, and a detailed characterization of the problem. In the second stage, the DMADV methodology (Define, Measure, Analyse, Design and Verify) is applied, with the use of the SMED (Single Minute Exchange of Die) tool during the analysis phase.The first objective has been achieved, namely the development of a standardized, efficient, and safe tool change process for the new line, resulting in the implementation of 8 work instructions.Afterwards, several improvement proposals were analysed, following a gradual logic of financial investment. It is worth highlighting that for the first proposal, by efficiently utilizing the company's resources, a 26% reduction in internal task times is expected, with a solution being demonstrated to achieve the second main objective. With financial investment in modifications to the tooling crossbars and the development of the Dummy Stand, a 73% reduction in internal time is estimated.Five out of seven improvement proposals have been accepted, and their implementation will be completed once the equipment testing phase concludes.eng
dc.language.isopor-
dc.rightsopenAccess-
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/-
dc.subjectDMADVpor
dc.subjectSMEDpor
dc.subjectMelhoria Contínuapor
dc.subjectNova Linha de Laminagempor
dc.subjectProcesso de Setuppor
dc.subjectDMADVeng
dc.subjectSMEDeng
dc.subjectContinuous Improvementeng
dc.subjectNew Rolling Lineeng
dc.subjectSetup Processeng
dc.titleAbordagem Integrada para Melhoria do Processo de Setup de uma Nova Linha de Laminagempor
dc.title.alternativeIntegrated Approach for Improving the Setup Process of a New Rolling Lineeng
dc.typemasterThesis-
degois.publication.locationDepartamento de Engenharia Mecânica-
degois.publication.titleAbordagem Integrada para Melhoria do Processo de Setup de uma Nova Linha de Laminagempor
dc.peerreviewedyes-
dc.identifier.tid203338774-
thesis.degree.disciplineCiências de Engenharia Mecânica-
thesis.degree.grantorUniversidade de Coimbra-
thesis.degree.level1-
thesis.degree.nameMestrado em Engenharia e Gestão Industrial-
uc.degree.grantorUnitFaculdade de Ciências e Tecnologia - Departamento de Engenharia Mecânica-
uc.degree.grantorID0500-
uc.contributor.authorMendes, Guilherme Santos::0000-0002-0842-011X-
uc.degree.classification18-
uc.degree.presidentejuriPinto, Telmo Miguel Pires-
uc.degree.elementojuriSilva, Cristóvão-
uc.degree.elementojuriFerreira, Luís Miguel Domingues Fernandes-
uc.contributor.advisorFerreira, Luís Miguel Domingues Fernandes::0000-0003-0459-0020-
item.grantfulltextopen-
item.cerifentitytypePublications-
item.languageiso639-1pt-
item.openairetypemasterThesis-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextCom Texto completo-
Appears in Collections:UC - Dissertações de Mestrado
Files in This Item:
File SizeFormat
Dissertação_Guilherme_Mendes.pdf8.89 MBAdobe PDFView/Open
Show simple item record

Page view(s)

48
checked on May 8, 2024

Google ScholarTM

Check


This item is licensed under a Creative Commons License Creative Commons