Utilize este identificador para referenciar este registo: https://hdl.handle.net/10316/45581
Título: A stochastic model and algorithms for determining efficient time–cost tradeoffs for a project activity
Autor: Godinho, Pedro 
Costa, João Paulo 
Palavras-chave: Stochastic modeling; Activity management; Multicriteria analysis; Time cost tradeoff
Data: 30-Mai-2017
Editora: Springer Verlag
Título da revista, periódico, livro ou evento: Operational Research
Resumo: We consider a stochastic model for the time-cost tradeoffs of an activity. In this model the activity can be undertaken by using several different resources, and the resource in use may change according to the way the activity is evolving. We present two algorithms for identifying strategies that are in a predefined neighborhood of the efficient set: one of them is based on a tree structure and the other is based on dynamic programming. Both algorithms take advantage of some mathematical properties of the model in order to reduce their running time and memory requirements. We present the results of some computational tests, as well as an application example. We conclude that the dynamic programming algorithm performs quite well, although it is sometimes necessary to adjust the parameters related to the neighborhood of the efficient set to be able to have reasonable running times.
URI: https://hdl.handle.net/10316/45581
ISSN: 1109-2858
DOI: 10.1007/s12351-017-0326-5
Direitos: embargoedAccess
Aparece nas coleções:I&D CeBER - Artigos em Revistas Internacionais

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato
ORIJ final.pdf1.05 MBAdobe PDFVer/Abrir
Mostrar registo em formato completo

Citações SCOPUSTM   

2
Visto em 9/nov/2022

Citações WEB OF SCIENCETM
20

2
Visto em 2/mar/2024

Visualizações de página 10

883
Visto em 16/abr/2024

Downloads

279
Visto em 16/abr/2024

Google ScholarTM

Verificar

Altmetric

Altmetric


Este registo está protegido por Licença Creative Commons Creative Commons