Utilize este identificador para referenciar este registo:
https://hdl.handle.net/10316/45563
Título: | Simulation-based estimation of state-dependent project volatility | Autor: | Godinho, Pedro | Palavras-chave: | Simulation; Project volatility; Real options | Data: | 25-Out-2017 | Editora: | Taylor and Francis | Título da revista, periódico, livro ou evento: | The Engineering Economist | Resumo: | Project volatility is an essential parameter for real options analysis, and it may also be useful for risk analysis. Many volatility estimation procedures only consider the volatility in the first year of the project. Others consider that different years may have different values of the project volatility. This paper takes into account that volatility may change not only with time but also with the state of the project. Two possible definitions for the project volatility are considered, the log-variance and the variance of the project value, and two simulation based procedures are proposed for estimating state-dependent volatility: two-level simulation and one and a half level simulation. Computational experiments show that both the procedures perform better than the method proposed by Copeland and Antikarov, and that the one and a half level simulation procedure leads to the most accurate estimations of project volatility. | URI: | https://hdl.handle.net/10316/45563 | DOI: | 10.1080/0013791X.2017.1384523 | Direitos: | embargoedAccess |
Aparece nas coleções: | I&D CeBER - Artigos em Revistas Internacionais |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
Simulation-based estimation of state-dependent project volatility.pdf | 1.65 MB | Adobe PDF | Ver/Abrir |
Citações WEB OF SCIENCETM
10
1
Visto em 2/abr/2024
Visualizações de página 50
531
Visto em 16/abr/2024
Downloads
315
Visto em 16/abr/2024
Google ScholarTM
Verificar
Altmetric
Altmetric
Este registo está protegido por Licença Creative Commons