Utilize este identificador para referenciar este registo: https://hdl.handle.net/10316/45563
Título: Simulation-based estimation of state-dependent project volatility
Autor: Godinho, Pedro 
Palavras-chave: Simulation; Project volatility; Real options
Data: 25-Out-2017
Editora: Taylor and Francis
Título da revista, periódico, livro ou evento: The Engineering Economist
Resumo: Project volatility is an essential parameter for real options analysis, and it may also be useful for risk analysis. Many volatility estimation procedures only consider the volatility in the first year of the project. Others consider that different years may have different values of the project volatility. This paper takes into account that volatility may change not only with time but also with the state of the project. Two possible definitions for the project volatility are considered, the log-variance and the variance of the project value, and two simulation based procedures are proposed for estimating state-dependent volatility: two-level simulation and one and a half level simulation. Computational experiments show that both the procedures perform better than the method proposed by Copeland and Antikarov, and that the one and a half level simulation procedure leads to the most accurate estimations of project volatility.
URI: https://hdl.handle.net/10316/45563
DOI: 10.1080/0013791X.2017.1384523
Direitos: embargoedAccess
Aparece nas coleções:I&D CeBER - Artigos em Revistas Internacionais

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato
Simulation-based estimation of state-dependent project volatility.pdf1.65 MBAdobe PDFVer/Abrir
Mostrar registo em formato completo

Citações WEB OF SCIENCETM
10

1
Visto em 2/abr/2024

Visualizações de página 50

531
Visto em 16/abr/2024

Downloads

315
Visto em 16/abr/2024

Google ScholarTM

Verificar

Altmetric

Altmetric


Este registo está protegido por Licença Creative Commons Creative Commons