Utilize este identificador para referenciar este registo:
https://hdl.handle.net/10316/4227
Título: | Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry | Autor: | Silva, Cristovão Magalhães, José M. |
Palavras-chave: | Lot size scheduling; Unrelated parallel machines; tool wear; heuristics | Data: | 2006 | Citação: | Computers & Industrial Engineering. 50:1-2 (2006) 76-89 | Resumo: | In this paper, we present an industrial problem found in a company that produces acrylic fibres to be used by the textile industry. The problem is a particular case of the discrete lot sizing and scheduling problem (DLSP). In this problem, lots of similar products must be generated and sequenced in ten unrelated parallel machines, in order to minimize tool changeovers and the quantity of fibre delivered after the required due date. The company problem is original because a changeover can occur between two lots of the same product due to tool wear. We analyse the problem in detail and present an adaptation of a heuristic found in the literature to solve it. Results obtained with the proposed heuristic are compared with results that used to be obtained by the production planner, using historical data. | URI: | https://hdl.handle.net/10316/4227 | DOI: | 10.1016/j.cie.2006.01.001 | Direitos: | openAccess |
Aparece nas coleções: | FCTUC Eng.Mecânica - Artigos em Revistas Internacionais |
Ficheiros deste registo:
Ficheiro | Descrição | Tamanho | Formato | |
---|---|---|---|---|
file997bcacdaed14d1fb8208723dc489424.pdf | 591.09 kB | Adobe PDF | Ver/Abrir |
Citações SCOPUSTM
64
Visto em 9/nov/2022
Citações WEB OF SCIENCETM
20
48
Visto em 2/mai/2023
Visualizações de página 50
438
Visto em 16/abr/2024
Downloads
384
Visto em 16/abr/2024
Google ScholarTM
Verificar
Altmetric
Altmetric
Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.